Current page:

Home

/

News

/

What is the lead time for long machine screw?

News

Contact Us

Tel:

+86 13143444311

Email:sst@szsst88.com

Fax:+0086-755-27322278

Address:Building 9, First Industrial Zone, Tantou Industrial City, Songgang Street, Baoan District, Shenzhen 518105, Guangdong, China

What is the lead time for long machine screw?

Now screw fasteners can be purchased spot through the network, but some screw fasteners are not in stock on the network, they need to find the manufacturer to customize, such as long machine screw, then how long is the delivery cycle?

long machine screw

Suppose that the size of this long machine screw is M6*780, the cup head has a hexagon socket and carbon steel material, the required quantity is 10000pcs, and the surface treatment is electrophoresis.

long socket head screw

If production is carried out according to the above assumption, it needs to be divided into two situations, one is mold opening, and the other is no mold opening. The mold opening time is generally 9-12 working days. The time to debug the machine is about 1 working day. It takes about 4 working days to head and rub the thread. The surface treatment takes about 3-5 days. And it doesn’t even count the time of listing.

long thin no4 100mm screws

If there happens to be a machine in the screw factory producing similar specifications, then after the production of the screws on the machine, it will be the turn of the long machine screws of this specification. But if the screws produced on the machine are not similar to the long machine screw of this specification, then we need to arrange the order in the factory for production.

 

Skype: kalyn qin

M: +86 18818786322

Tel: +86 0755-27322278

annie@szsst88.com

Add: No. 11, Dinghou Road, Dongfang Community, Songgang Street, Baoan District, Shenzhen, Guangdong, China

12 月-09-2020

kalyn