How long does the 0 80 large head screw custom cycle last?
Generally, if it is not a standard fastener, it is rarely seen in the market, and it is generally required to be customized. James needs to make a 0 80 large head screw. After finding Shi Shi Tong, ask if we can produce it. How long is the cycle of production?
Delivery time This is the complexity of the screw, and if it is special, it needs to open the mold, or need to order the wire, and different surface treatment, their treatment is not the same. After James gave us the drawings, we evaluated it. The 0 80 large head screw is a wire that needs to be ordered, and a punch is ordered. The time to order the wire and the punch is about 12-15 days. After all, the wire of titanium takes a long time.
Therefore, the delivery time of James’s 0 80 large head screw is 15-20 working days. If the screws of James are made of stainless steel wire, the production cycle is about 5-10 days. The time for ordering the wire is omitted. Later, James used titanium material.
If you want to find 0 80 large head screw please contact us: annie.li@szsst88.com whatsapp: +86 18124507113