How long is the production cycle of long screw?
When we buy something on the Internet, some hope to arrive soon, some only care about it this thing has inventory, he is not in a hurry. Different people have different requirements for the delivery date. Some people need very urgent, hope to buy today to today. The same is true for long screws. How long is the production cycle for long screw?
If this long screw has molds, spare machines, and materials in the factory, according to the working time of the day, it can produce about 5000 pieces a day. If there is no mold, then you need to order the mold. Generally, it takes about 9-12 working days to produce the mold for the multi-station and closing machine. After the head part is finished, the thread needs to be rubbed. According to the length of the screw, the thread should be rubbed by hand or by machine. If it is done by machine, it can be done in one day. If it is done manually, it will take about 1-2 working days to complete.
After the long screw is finished rubbing the thread, it is to do the surface treatment. If it is just the natural cleaning, then it will take about 2 working days. If the surface is hanging plating, it may take 3-5 working days.
Since we are not sure about the size and requirements of this screw, we can only give you a rough production time. If you want to know a more accurate production cycle, please tell us your requirements. We will tell you how long the production cycle is after we evaluate the drawing of the long screw.
|
Skype: kalyn qin
M: +86 18818786322
Tel: +86 0755-27322278
annie@szsst88.com
Add: No. 11, Dinghou Road, Dongfang Community, Songgang Street, Baoan District, Shenzhen, Guangdong, China |